| Executive Summary of the Feasibility Study for the proposed Modernised Railway Training Centre Project at Ihumwa. |
download |
| INVITATION TO EARLY MARKET ENGAGEMENT (EME) WORKSHOP (PHYSICAL AND VIRTUAL CONSULTATIVE MEETING) |
download |
| TRC- ANNUAL_GHG_REPORT 2024-2025 |
download |
| Environmental and Social Management Plan (ESMP) for the Standard Gauge Railway Project Phase II (Tanzania and Burundi Section) |
download |
| RESETTLEMENT ACTION PLAN FOR THE STANDARD GAUGE RAILWAY PROJECT FROM TABORA TO KIGOMA SECTION - LOT 6 COVERING 50 KM (64 KM TO 114 KM) |
download |
| RESETTLEMENT ACTION PLAN FOR THE STANDARD GAUGE RAILWAY PROJECT FROM TABORA TO KIGOMA SECTION - LOT 6 COVERING 55 KM (195 KM TO 250 KM) |
download |
| Ripoti ya Ukaguzi wa Hesabu za TRC 2022/2023 |
download |
| ESIA TIRP II |
download |
| VGPF TIRP II |
download |
| LMP TIRP II |
download |
| SEP TIRP II |
download |
| ESCP TIRP II |
download |
| SGR LOT 6 (TABORA - KIGOMA) ESIA REPORT |
download |
| SGR LOT 6 (TABORA - KIGOMA) ESIA REPORT |
download |