| RESETTLEMENT ACTION PLAN FOR THE STANDARD GAUGE RAILWAY PROJECT FROM TABORA TO KIGOMA SECTION - LOT 6 COVERING 50 KM (64 KM TO 114 KM) |
download |
| RESETTLEMENT ACTION PLAN FOR THE STANDARD GAUGE RAILWAY PROJECT FROM TABORA TO KIGOMA SECTION - LOT 6 COVERING 55 KM (195 KM TO 250 KM) |
download |
| Ripoti ya Ukaguzi wa Hesabu za TRC 2022/2023 |
download |
| ESIA TIRP II |
download |
| VGPF TIRP II |
download |
| LMP TIRP II |
download |
| SEP TIRP II |
download |
| ESCP TIRP II |
download |
| SGR LOT 6 (TABORA - KIGOMA) ESIA REPORT |
download |
| SGR LOT 6 (TABORA - KIGOMA) ESIA REPORT |
download |
| RESETTLEMENT ACTION PLAN FOR PROPOSED TABORA - KIGOMA SGR. |
download |
| ESIA REPORT FOR SGR UVINZA - KIDAGYE |
download |
| FINAL RAP REPORT UVINZA KIGADYE |
download |
| Lot 3 and 4 SGR ESIA Report |
download |